PROJECTS

Core Competences

Project Management, Engineering, Design, Inspection, Consulting, and Technical Staffing to include:

(Engineers, Designers, QA/QC Auditors and Inspectors, Technicians, Planners, Schedulers)

Previous Projects

BASF, Huntsville, AL

Project Management/ Engineering

Project Scope: Planning and Scheduling/ Project Management Support Installation of a Square D Power

Zone 4 Power Dry II substation. This was a 2500 KVA unit. The transformer is a 12,470 high voltage and 480 volts low voltage unit which is rated for 3000 amps. The feeder breaker unit has a 4000 amp main breaker and four 1600 amp feeder breakers. The substation was installed to feed a new production line.

Conoco/ Phillips, Coker Turnaround, Belle Chase, LA

Engineering/Project Staffing/ Project Support/ Planning and Scheduling/ Inspection

Project Scope: Upgrade of Electrical and Instrumentation systems. Provide support for mechanical equipment. Provided technical staffing and engineering support for turnaround activities. Provided a DCS Engineers, I/C Technicians, E/I Inspectors, Rotating Equipment Specialist for loop checks and start-up activities.

BP Petrochemical Complex Turnaround, Decatur, AL

Project management of annual electrical maintenance. This included substation transformer, breaker &
Switchgear testing. The transformer testing included TTR, Insulation and Oil Analysis. The breaker test consisted of testing the trip unit with secondary current injection, Phase to Phase and to Ground Insulation, DLRO test of contacts and connections and hi-pot vacuum bottle test. Clean/Inspect Motor Control Centers. Checking all terminal connections in MCC buckets. Upgrade of Protective Relays on 23 feeder breakers, 3 tie breakers and 6 main breakers while the system was in service. Removal of 126 electromechanical protective relays. Installation of 33 SEL protective relays. Removal of over 3600 wires in the protective relay circuits & rewire using approximately 1500 new SIS wires to the electronic relays.

Each system control circuit was function tested to the output of the trip and close coil circuits. Performed Power Studies which included fault contributions, protective device coordination and Arc Flash hazard analysis. Use of SKM and ETAP software. Provided recommendation of solutions for the reduction of arc flash levels at all voltage levels. Reduced arc flash calories from over 5000 to less than 40.

CLIENT PROJECT VOLTAGE MILES STRUCTURE TYPE YEAR COMPLETED SERVICES PROVIED
BRAZO ELECTRIC COOPERATIVE, WACO, TX
GIBBONS CREEK-ROANS PRAIRIE SUBSTATION UPGRADE
138 KV 11 CONCRETE POLE 2017
RTU AND SCADA UPGRADE, LIGHTING SWITCHING SURGE DESIGN, PROJECT MANAGEMENT
BRAZO ELECTRIC COOPERATIVE, WACO, TX IOLA-ROANS PRAIRIE LINE AND SUBSTAION UPGRADE 138 KV 12 CONCRETE POLE 2017 RTU AND SCADA UPGRADE, PROJECT MANAGEMENT
CITY OF BENTONVILLE, BENTONVILLE, AK SUBSTATION E LINE AND SUBSTATION UPGRADE 161 KV 8 TUBULAR STEEL 2018
RTU AND SCADA UPGRADE, INSULATOR AND HARDWARE DESIGN, PROJECT MANAGEMENT
BIG RIVERS ELECTRIC COOPERATIVE, HENDERSON, KY
REID-WILSON-COLEMAN SUBSTATION UPGRADE 345 KV 64 LATTICE STEEL 2018
RTU AND SCADA UPGRADE, PROJECT MANAGEMENT, CORONA AND FIELD EFFECT
CITY OF BENTONVILLE, BENTONVILLE, AK SUBSTATION E LINE AND SUBSTATION UPGRADE 161 KV 2 LATTICE STEEL 2018
RTU AND SCADA UPGRADE, PROJECT MANAGEMENT, CORONA AND FIELD EFFECT
TENNESSEE VALLEY AUTHORITY DECATUR, AL
SUBSTATION A LINE AND SUBSTATION UPGRADE 161 KV 2 LATTICE STEEL 2019 161/12.47-kV distribution substations, designed as a single bus arrangement at 161-kV and main and transfer bus arrangement at 12.47-kV. RTU AND SCADA UPGRADE
RELIANT ENERGY, HOUSTON, TX SUBSTATION A LINE AND SUBSTATION UPGRADE 12.47 KV 2 TUBULAR STEEL 2019 designed and prepared the layout of a 2.8-mile section of a three-phase, single circuit, 12.47-kV distribution tie-line between two substations. RTU AND SCADA UPGRADE, PROJECT MANAGEMENT

The W4 Group project management philosophy\strategy, approach and process

We focus on a specific and controlled start, middle and end regular reviews of progress against the plan and, in particular, against the Business Case flexible decision points management control of any deviations from the plan the involvement of management and stakeholders at the right time and stage during the project. Good communication channels between project workers, project management, and the rest of the
organization.

The value-added services that the W4 Group provide and what differentiates our company from other engineering firms?

The W4 Group is small company with little overhead. We are able to adjust to the project needs and provide a competitive rate that larger firms are able to compete with based on their overhead.The standards that the W4 Group firm comply with: IEEE, ANSI, NEC, NETA, NFPA, NEMA

The W4 Group software capabilities, and utilization

ETAP, AutoCAD, Wonder ware, Micro station, Allen Bradley, Win CC, Experion, Yokogawa, Delta V, Triconex, Honeywell, Emerson Process Management Provox, Bently Nevada